Back to projects

Brisbane Pool Renovation: Balmoral South Brisbane

Brisbane Pool Renovation

6 Mar, 2012

Brisbane Pool Renovation: Balmoral South Brisbane

Start Date: 06/03/2012

Completion Date: Late March 2012

Details: The pool is of concrete construction and contained a ceramic coping tile, pebble interior and painted block wall. The pool also contains 2 x glass portholes that filter light into a downstairs basement area. The portholes of the pool have ruptured their seals and leaked water into the downstairs room of the house. The coping tiles have also lifted due to insufficient water proofing and the block wall has began to crack in some areas. Just Add Water Pools have been commissioned to undertake the repairs to the portholes, block wall and coping tiles as well as replace the pool equipment that was damaged when the pool leaked into the filtration room.

If your pool is cracked or leaking or in need of a makeover contact us today. 0755462057

© 2017 POOL BUILDERS BRISBANE - POOL RENOVATION BRISBANE - POOL CONSTRUCTION BRISBANE - POOL RESURFACING BRISBANE - CONCRETE POOLS BRISBANE - POOL REFURBISHMENT BRISBANE - POOL RESTORATION BRISBANE - ABOVE GROUND CONCRETE POOLS BRISBANE - SWIMMING POOLS BRISBANE
Crafted by Thrive