Back to projects

Brisbane Pool Resurfacing: The Gap North Brisbane Qld

Brisbane Pool Resurfacing

23 Feb, 2012

Brisbane Pool Resurfacing: The Gap North Brisbane Qld

Start Date: 21/02/2012

Completion Date:  27/02/2012

Details: The existing pool is of concrete construction and contained a brick coping, ceramic waterline tiles, slate step tiles and a marblesheen interior. The pool was looking a little tired and significant calcium deposits and black spot were visible on the interior. The client requested that the coping remain and that the interior, slate, waterline tiles and old light be removed. The pool was drained and all drummy surfaces were removed. A scratch coat was then applied ready for the new 1-2mm white and black pebble interior. The pool resurfacing is complete within 7 days of being emptied.

If your pool is looking tired and needs resurfacing or renovating call Just Add Water Pools today to bring your swimming pool back to life. 0422993833

© 2014 Pool Builders Brisbane – Pool Renovation Brisbane – Pool Construction Brisbane – Pool Resurfacing Brisbane – Concrete Pools Brisbane – Pool Refurbishment Brisbane – Pool Restoration Brisbane – Above Ground Concrete Pools Brisbane – Swimming Pools Brisbane - Web Design Gold Coast thrive web design