Pool Resurfacing: Shailer Park Gold Coast Qld
Start Date: 06/02/2011
Completion Date: 09/02/2011
Details: The existing pool is of concrete construction and had a vinyl liner interior. The pool was drained the old liner was removed and the slate tiles were taken off. The pool was then acid washed and pressure cleaned prior to a scratch coat being applied ready for the new 1-2mm white and gold pebble crete. All pool fittings were replaced and a new LED pool light was installed and then Just Add Water the pool is ready to use again within 5 days.